Steven Ralston, CFA
Dejour Energy (DEJ)
has successfully drilled, cased, fracture stimulated and flow tested
its first natural gas well at South Rangely in Colorado. Late yesterday,
Dejour announced the results of the flow test: 315 MCF per day for more
than 10 days with zero decline in production or pressure, confirming
the presence of commercial quantities of trapped hydrocarbons. Now the
company will test for an oil leg that is typically found down dip from
similar gas accumulations in the Mancos "C" area. The action plan is
expected to be announced during the second quarter of 2012. Given the
positive results so far, Dejour will also most likely follow-on with a
horizontal well program.
Also, management is focused on developing Gibson Gulch, Dejour’s
Kokopelli field development project located over the Williams Fork
structure, a liquid rich gas area in the Piceance Basin. After filing a
Master Development Plan with the Bureau of Land Management, drilling
permits were received in the fourth quarter for four initial wells on
leased Federal lands. Construction commenced on the first of two
drilling pads. Having chosen eight PUD (Proved UnDeveloped reserves)
sites in close proximity to proven wells drilled by Barrett Corp. (BBG)
or Williams Companies (WMB), the first eight wells should be drilled
during the first quarter this year, after which all eight wells should
be fracture stimulated and completed in the following quarter.
Production from Dejour’s Kokopelli field development project is expected
to commence during the third quarter of 2012. Management plans on
drilling 16 wells annually, with the drilling program becoming
self-funding in 2014. Williams Companies is extending a pipeline from
its Grand Valley gathering system to the Kokopelli Field, where Dejour’s
wells will be located, providing an efficient method to transport
Dejour’s natural gas into a large-scale, high-volume distribution
system.
Finally, Dejour Energy continues to further develop and enhance
production from the Woodrush property in northeastern British Columbia.
In the first quarter of 2011, a waterflood project was successfully
implemented on the Halfway E oil pool located at Woodrush allowing
production to be managed by a Voidage Replacement Scheme instead of by
the Daily Oil Allowable method. In November, Dejour Energy drilled a
third well into the Halfway E oil pool. Eight feet of porous oil bearing
sands were encountered. Management expects net production from the new
well to reach at least 200 barrels of oil per day during the first
quarter of 2012. We expect net production from the Woodrush property to
reach 800 BOE/D by the end of 2012.
We reiterate our Outperform rating and price target of $1.00.
Please email scr@zacks.com with DEJ as the subject to request a free copy of the full research report.To view our most recent research reports and subscribe to our daily morning email alert, visit http://scr.zacks.com/.
Follow Zacks Small Cap Research on Twitter at Twitter.com/ZacksSmallCap