By Steven Ralston, CFA
After the close yesterday, Dejour Energy (NYSE MKT:DEJ) announced that the first two of four new wells at the Kokopelli project are in production. Combined sales of natural gas from the two wells began at approximately 550 MCF per day (MCF/D) and have increased to 1,500 MCF/D over two days. The wells are expected to continue cleaning up for at least two more weeks.
The remaining two wells (of the four on the pad) have been hydraulically fractured. Flow back (water-based fluid that flows back to the surface after the completion of hydraulic fracturing) from those wells will begin next week, and all four wells should be producing by August 9th.
The process of defining initial production usually takes about a month. Typically a pilot gas well (not a offset well) produces increasing amounts of gas for the first 12-to-15 days, after which production tails off to a level that will decline very slowly over the next two months. Though it is too early to definitively determine the production profile, a rate of 750 MCF/D per producing well after two days of production is thus far relatively consistent with management’s expectations, which were that the four wells should produce a combined 5.0 MMCF/D during the initial production phase.
Actual initial production (IP) rates will be determined after several weeks and released thereafter. The IP rates will aid in evaluating Estimated Ultimate Recovery (EUR) and possibly allow for adjusting the 51-101 year-end reserve estimates to better reflect Dejour’s assets in the ground at Kokopelli.
The initial well at Kokopelli (Federal 6-7-16-21) was drilled between September and November 2012. The 8,436-foot well intersected five gas-bearing zones in the Williams Fork (Mesaverde) formation. Two zones are without groundwater and will be the targets for perforation and hydraulic fracturing. Since receiving $6.5 million in capital from a private Denver-based drilling fund in January, Dejour has announced the successful drilling of three additional wells from the existing pad 21-A. Patterson-UTI Energy (NasdaqGS:PTEN) was contracted to drill and case the new wells which target the Williams Fork (aka Mesaverde) sandstone formation down to a depth of 8,400 feet. The second well (Federal 6-7-13-21) was drilled to a depth of 8,124 feet in April 2013 followed by Federal 6-7-14-21 (depth of 8,400 feet) and Federal 6-7-15-21(8,130 feet) in May. All three wells drilled in 2013 encountered ample gas shows from multiple horizons of the NGL-rich Williams Fork formation. Thereafter, in July 2013, Halliburton (NYSE:HAL) completed all four wells by perforating and hydraulic fracturing multiple zones of the Williams Fork formation in an eight-stage fracking process. In addition, the gas sales line tie in was completed in May.
For its financial investment of $6.50 million of the $8.2 million needed to complete the multi-well Kokopelli project, the Denver-based drilling fund will receive a priority payout from initial production until 125% of the capital contribution is received. After the fund has received $8.125 million, Dejour’s payout in the four-well project will increase from between 10% and 14% (the specific percentage will be determined by the actual cash invested in the drilling program) to approximately 39% to 35%%, and the drilling fund will earn between 54% and 58% of the cash flow after costs. During the entire production phase, Dejour will receive an infrastructure usage fee of $0.20 per MCF of gas produced. Despite the financial agreement, Dejour retains ownership of a 93% working interest of the four-well project with Brownstone owing the remaining 7%. The fund has the right of first refusal on the next multi-well project at Kokopelli, which would entail the fund to provide an additional $8.5 million capital funding. The terms of the financing do not pertain to Dejour's 71.4% working interest in the deeper Niobrara/Mancos shale gas play over the entire 2,200 gross acres of the lease.
According to management, the lease on the entire 2,200 gross acres at Kokopelli was preserved through a diligent drilling effort in late 2012, for which Colorado's Bureau of Land Management provided a two-year extension on the original 10-year lease dated November 2002. Since production has been achieved, the lease on the southern 680 acres is now being held-by-production (HBP) with the northern 1,500 acres requiring a well by mid-2014 to preserve that portion of the leasehold. Therefore, management is contemplating the drilling and completion of a well into the Niobrara/Mancos formation in the northern lease before the deadline.
Our rating on Dejour’s stock remains Neutral. Despite the progress at Kokopelli, Dejour has been hampered by a lack of sufficient working capital to independently develop production from its oil & gas leases. Also, we are concerned that at least one production well must be completed by mid-2014 to retain the oil & gas lease on the northern portion of Kokopelli. We look forward to the announcement of the initial production profile from the first four Kokopelli wells so that we can better value Dejour’s reserves relative to the year-end resource assessment.
A copy of the full research report can be downloaded here >> Dejour Energy Report
Please visit SCR.Zacks.com for additional information on our research and coverage universe, and Subscribe to receive our articles and reports emailed directly to you each morning.