View all news

WCUFF: World Copper Limited Releases Updated MRE on the Zonia Project; Target Raised. Drilling programs slated for Zonia & Escalones in 2023. An updated PEA on Zonia is anticipated to be completed later in 2023.

03/27/2023

By Steven Ralston, CFA

OTC:WCUFF | TSXV:WCU

READ THE FULL WCUFF RESEARCH REPORT

World Copper Limited (OTC:WCUFF) (TSXV:WCU) is pursuing the development of two copper oxide projects, the Zonia Project (Arizona) and the Escalones Project (Chile). There are several economic advantages in mining and processing ore from copper oxide versus copper sulfide deposits. Copper oxide deposits are shallower, usually less the 300m below surface; in addition, the oxidized mineralization is generally amenable to heap-leaching. Hence, copper production from copper oxide ore is more economic, simpler and cleaner than the process for copper sulfide ore.

An updated MRE was recently completed on the Main deposit at Zonia. In addition, management is in the process of expanding the resource at the Zonia Project through the exploration of a porphyry target northeast of the Main deposit known as Zonia Norte. Furthermore, the resource at the Escalones Project in Chile is being advanced through exploratory drilling programs at the Mancha Amarilla lithocap and at skarn mineralization, both of which are adjacent to the Escalones Main deposit.

Updated Mineral Resource Estimate (MRE) for Zonia Copper Oxide Project (Arizona)

On February 23, 2023, World Copper released an updated mineral resource estimate (MRE) on the Zonia Copper Oxide Project. The supporting NI 43-101 technical report on the updated MRE is expected to be filed on SEDAR by April 10th. Completed without any additional drilling, the 2017 historical MRE was updated by adding management’s additional insights on the deposit, along with taking into account the increased price in copper from US$2.50 to US$3.60 per pound. Consequently, the cut-off grade was lowered to 0.125%–0.130% Cu range from 0.20% Cu in the 2017 MRE. [The MRE includes a table comparing the 2022 MRE with the 2017 MRE using the same 0.20% Cu cut-off – see below). Also, the maximum search distance used in the wireframe modeling was increased from 600 feet to 960 feet. The assumed combined operating ore costs (handling, processing, G&A and shipping costs) increased from US$5.35 to US$6.30/ton. Metallurgical recoveries of copper remained the same (73% for oxide blocks and 70% for transition blocks). The effective date of the updated MRE is September 1, 2022.

The total contained metal in the updated MRE (Measured, Indicated & Inferred) increased 54.4% to approximately 1.025 billion pounds Cu compared to 0.665 billion pounds Cu in the 2017 estimate. By category, the updated Measured & Indicated resource decreased 11.6% to 450.5 Mlb Cu with the average grade decreasing to 0.30% while the Inferred resource increased 272.2% to 575.4 Mlb Cu with the average grade now being 0.24% Cu versus 0.28% Cu in the 2017 estimate.

The tables below compare the 2022 Updated Resource Estimate to the 2017 Historical Resource Estimate, one at their respective base-case cut-offs and the other at a constant 0.20% Cu cut-off.

Zonia Norte Target

Simultaneously with the advancement of the Zonia Main deposit, management plans to expand the Project’s resource by exploring the prospective Zonia Norte porphyry target situated 1.5 km to the north-northeast of the Main deposit. This 2.5km x 1.5 km copper-molybdenum-manganese anomaly is currently interpreted to represent the center of a second porphyry.

The company is planning to conduct an 18-hole (5,000m) exploratory drill program during 2023 which will consist of shallow (100m-150m) holes that target near-surface copper oxide mineralization. Zonia Norte was fully permitted by the previous operator, and World Copper plans to re-start the permitting process for this exploratory program, which will also include sampling and mapping of historical high-grade copper occurrences (e.g. Copper Crown) on the north and east edges of the Zonia Norte.

Cardero Loans

In February 2023, World Copper extended the maturity of four loans (known as the Cardero loans) to February 22, 2024. The Cardero loans are advances from E.L. II Properties Trust, a company owned by a Director of World Copper (Robert C. Kopple) with an aggregate amount of US $1,065,265 (CAD $1,445,031.97). In return for the extension, non-transferable one-year Bonus warrants were issued to E.L. II Properties Trust. Each Bonus warrant is exercisable into one common share at a price of CAD $0.14 per share.

Capital Raises

On March 10, 2023, World Copper reported that the company sold its 2,000,000 shares of Electric Royalties Ltd. (which were received in August 2022) to Wealth Minerals Ltd. at a price of $0.25 per ELEC share. World Copper received gross proceeds of CAD $500,000 in cash.

On March 8, 2023, World Copper announced a non-brokered private placement of up to 6,944,444 Units at a price of $0.18 per Unit. Each Unit consists of one common share and one-half of one common share purchase warrant exercisable for two years at a price of $0.30 per share. Potential gross proceeds would be CAD $1,250,000.

Anticipated Upcoming Developments

mid-2023 - small, shallow (100m-150m) exploratory drilling program at NNE anomaly at Zonia

2023 - drilling program at Escalones

late-2023 - update PEA on Main deposit at Zonia

2024 - PFS on Main deposit at Zonia

2024 - exploratory drill program at Rio Negro

2025 - PFS on Main deposit at Escalones

Valuation

Based on our calculation of share value of attributable resources, our target for World Copper’s stock is $0.92. Our calculation of share value of attributable resources is based on the ascertained net asset value of the Escalones and Zonia Projects, utilizing latest information provided by the PEA (Preliminary Economic Assessment) on the Escalones Project (issued in March 2022) and the updated MRE (Mineral Resource Estimate) on the Zonia Copper Oxide Project (disclosed in February 2023).

SUBSCRIBE TO ZACKS SMALL CAP RESEARCH to receive our articles and reports emailed directly to you each morning. Please visit our website for additional information on Zacks SCR. 

DISCLOSURE: Zacks SCR has received compensation from the issuer directly, from an investment manager, or from an investor relations consulting firm, engaged by the issuer, for providing research coverage for a period of no less than one year. Research articles, as seen here, are part of the service Zacks SCR provides and Zacks SCR receives quarterly payments totaling a maximum fee of up to $40,000 annually for these services provided to or regarding the issuer. Full Disclaimer HERE.

Multimedia Files:

Categories: Press Releases
View all news